There is a lot going on, but I didn't really realize it. Doors, trim, paint, sunroom, and stone...oh my. Following the drywall, window and door trim was installed and then the upstairs walls were painted.
|
The foyer gets a light blue. |
|
Master Bedroom - Brown-Grey |
|
Julie's Frog Green |
|
Valerie's room gets a lavender treatment |
The sunroom finally came down. The new framing and roof is in place. We want to use a wall as the railing, but don't want to block the view. We are still kicking around ideas on how to do this.
|
All that is left is the tile. |
|
From the path |
|
From the neighbors. |
With the sunroom going up, they should be able to finish the exterior of the house. The stone veneer went up on the columns.
This week will be tough as they will be scraping the popcorn ceiling down and smoothing it out. The wood floors are scheduled to be refinished this Thursday. Both of these will make a big mess. The wood flooring will force us all into the basement for 2 days without access to the other levels. No oven, refrigerator, and only 1 bathroom.
The floor install for the foyer and upstairs bathrooms are also scheduled for this week. Once the bathroom floors are in, we can get the vanities in and get the countertops measured.