Thursday, September 9, 2010

Framing Done - What's Next?

Framing is complete including Val's dormer and all interior walls.  Progress will now appear to slow, as the fun stuff is done.
Val's Dormer on right
Val will have a nice set of large windows looking to the front yard.
There will be 2 closets for the Master Bedroom.  One that opens into the room.
That's it on the left with 2 double doors.
The 2nd closet is in the dressing area that also serves as a hallway to get to the office from the Master Bedroom.
The 2nd closet would be on the left here.
They started roughing in the ductwork today and should finish tomorrow.  We decided to move the air handler out of some spare space in the corner of a dormer to the small attic space.  This will make running the ducting a lot easier.  We just have to make sure that we can get up there to perform maintenance (i.e. replace filters). 
Air Handler in overhead
Ducting in Master Bedroom

Along with completing the ducting, the paper should be installed on the roof tomorrow with the shingles going on early next week. 